Project Activity: Maintenance of facilities – (Cable Hauling)
Description of Work: Haul and install approx. 145m of 12F cable from manhole outside 67 Monger Street to 5 pit outside 73 Monger Street.Civil work: Replace existing possible ACM 6 Pit with new P6 Pit.New P50 Installation required. Bore new P50 Conduit approx. 63m from Replaced 6 Pit to existing P5 Pit.
Access Start Date: 06/02/2025
Access Finish Date: 20/03/2025
Project Location: MONGER STREET BENCUBBIN WA 6477